This is a list of projects that I have planned:
- Masters coding and development;
- Get my Quadra 950 going properly with more RAM, MacOS7.6 and some big hard drives;
- Get a PowerBook 100 going (to have a shot at the Retro Challenge 2007);
- Get ethernet going on my Newton 2100;
- Start doing some basic Newton (probably OS 2.0) development;
- Build and configure my home office server (I picked up two 18.1 GB SCSI drives for this). It will be my G3 Server (beige, 300MHz, as much RAM as I can find). I will be using it for backups and storing photos.
As always, more time is required 🙁