Track layout complete (for the time being)

After many hours of tinkering the track layout of my N-gauge model railway is complete.  The new sections aren’t powered yet but a few hours with the soldering iron should sort that out.  I have also taken the opportunity to add some extra lighting.

IMG_0799

The layout features:
  • 11 turn outs (or points) – all are Peco electrofrog;
  • 7 sidings (of varying lengths, 5 can be isolated to park locomotives);
  • 3 tunnel mouths (1 double width, 2 single);
  • 2 station platforms (may be more to come);
  • 3 “loop” paths.

Leave a Reply

Your email address will not be published. Required fields are marked *